ScaffYard · New job
Sat 29 Aug, 04:17 BST
Loading the yard desk
Loading jobs
The book
Loading new job
Tape
Alt+N
Customer
Site address
Contact
Site contact
Phone
PO
Start date
Quoted weeks
The run · m
Length m
Height m
Width m
Return m
Bay and lift
Bay m
Lift m
Boarded lifts
Live takeoff
From the tape
Net
Labour
Engine
Weekly
Kit card
Weeks
Quoted
Pieces
Working
Kit from the tape
Notes
Tape · Tube and fitting
Tape the elevation — length, height, return, bay, lift. Independent tube and fitting on the wagon. The tape writes the kit list: Singles and Sleeves.
Alt+Nopens this page from the desk. Not while typing in a field.
Tape the elevation. The engine builds the kit sheet.
Tube and fitting
Net £1,941.74·No VAT
Quote valid 30 days.
6 bays, 3 lifts, 328 pieces, £1,941.74 net
2
328
6 bays·3 lifts
72.0 m² face14.4 m² boarded
pieces
Singles and Sleeves — yard names from the tape.
123
26
179