Scaffold handover certificate
- Customer
- Mrs Ridley
- Site
- 14 Chapel Row, Elmstead
- Erected on
- Fri, 16 Oct 2026
- Handed over on
- Fri, 16 Oct 2026
The scaffold handed over
9.6 m long by 8 m high, 4 boarded lifts at 2 m, 5 board with 1 inside, tube and fitting.
Design and load class
Write in: what it is built to and what it is rated to carry
Restrictions on use
Write in: anything this scaffold is not to be used for, and any part of it not handed over
Inspection
Inspected before first use on Fri, 16 Oct 2026 by Ray Cobb, and recorded as fit for use.
The duty
Under the Work at Height Regulations 2005, regulation 12, a scaffold is to be inspected before first use, at intervals of no more than 7 days, and after any event likely to have affected its stability.
This scaffold must not be altered, added to, or have any part removed, except by a competent scaffolder. Anything that could have affected its stability means it is inspected again before it is used.
Handed over for Halstow Scaffolding Ltd
Name, position and date
Received for Mrs Ridley
Name, position and date